Locomotives
Manufacturer Model Road Number
Burlington Northern
Atlas MP 15DC BN #1003 (DCC) DN163A3 (Installed)
Atlas GP 15-1 BN #1385
Atlas SD 24 BN #6244
Athearn F 45 BN #6628 (DCC – Sound) Tsunami (Factory)
Kato GP 50 BN #3107
Intermountain F 7 BN #724
BNSF
Kato SD70MAC BNSF #8802
Kato SD70MAC BNSF #9838
Kato SD70MAC BNSF #9959
Kato AC4400 BNSF #5608
Kato AC4400 BNSF #5615
Kato AC4400 BNSF #5624
Kato SD70ACE BNSF #9378
Kato SD70ACE BNSF #9385
Fox Valley ES44AC BNSF (Heritage 2) #5738 (DCC) DZ125IN (Installed)
Fox Valley ES44DC BNSF (Swoosh) (Christmas) #7236 DZ125IN
Fox Valley ES44DC BNSF (Swoosh) (Christmas) #7256 DZ125IN
Fox Valley ES44DC BNSF (Swoosh) #7632 DZ125IN
Fox Valley ES44DC BNSF (Swoosh) #7768 DZ125IN
CNW/UP
Kato AC4400CW CNW #8819 DN163K1C
Kato AC4400CW CNW #8835 DN163K1C
Atlas SD 9 GN #582 (DCC) DN163A0 (Installed)
Milwaukee Road
Atlas GP 38-2 Milwaukee Road #358
Atlas GP 38-2 Milwaukee Road #360
Atlas GP 38-2 Milwaukee Road #365
Atlas SD 7 Milwaukee Road #509
Atlas SD 7 Milwaukee Road #510
Kato NW2 Milwaukee Road #668
Atlas SD 60 Oakway #9058
SOO Line
Atlas SD 60 SOO #6050
Atlas SD 60 SOO #6057
This blog will follow the construction of a double deck N-scale model railroad. This model railroad will be based on the BNSF railroad.
Friday, May 20, 2011
Friday, May 13, 2011
Friday, May 6, 2011
Update: Staging Yard is finished
The staging yard is completed, I hope to have pictures up by the end of the weekend. I have been able to run 40 to 50 car trains through it without any major problems with derailments. All section of tracks have drops, next order of bussiness is to start to run the main buss line.
JSL
JSL
Thursday, April 7, 2011
Staging Track and Photos of BNSF Loco's
The staging yard is taking shape. I have discovered that Atlas Code 55 is easier to work with than Code 80. I have had little problems with soldering feeders and joiners. Now I am just wainting on another order of flex, turnouts and rerailers to finish the staging yard. The coal trains are both 32 cars - the staging yard should be able to handle trains of about 3 - 4 locos and 60 - 70 cars.
JSL
JSL
Monday, March 7, 2011
More benchwork for the BNSF
Hi Everyone! The peninsula staging yard is taking shape. The 5 staging tracks will be between 22 to 26 feet long. The turnouts and cork have been ordered. Hope to have another update next week. Sorry for the poor quality pictures from my blackberry, need to use the good camera next time.
JSL
Friday, February 18, 2011
Benchwork started on BNSF
Here is the start of the benchwork of the new BNSF. The benchwork is the start of the staging yard, 1st deck, 2nd deck and the valance brackets. Thanks to CSX Dixieline (Jamie) for the bracket ideas.
JSL
JSL
Wednesday, January 19, 2011
Changing ERA
Hi everyone. The layout room is ready for benchwook. The birch plywood has been ripped. I have decided to start modeling the modern BNSF railroad instead of the BN / BNSF transition period. I am keeping all of my older BN engines and rolling stock to use on the club layout. I wish I had some pictures to show... I hope to soon.
Subscribe to:
Comments (Atom)

