Friday, May 20, 2011

Locomotive Roster

Locomotives


Manufacturer Model Road Number

Burlington Northern
Atlas MP 15DC BN #1003 (DCC) DN163A3 (Installed)

Atlas GP 15-1 BN #1385

Atlas SD 24 BN #6244

Athearn F 45 BN #6628 (DCC – Sound) Tsunami (Factory)

Kato GP 50 BN #3107

Intermountain F 7 BN #724

BNSF
Kato SD70MAC BNSF #8802

Kato SD70MAC BNSF #9838

Kato SD70MAC BNSF #9959

Kato AC4400 BNSF #5608

Kato AC4400 BNSF #5615

Kato AC4400 BNSF #5624

Kato SD70ACE BNSF #9378

Kato SD70ACE BNSF #9385

Fox Valley ES44AC BNSF (Heritage 2) #5738 (DCC) DZ125IN (Installed)

Fox Valley ES44DC BNSF (Swoosh) (Christmas) #7236 DZ125IN

Fox Valley ES44DC BNSF (Swoosh) (Christmas) #7256 DZ125IN

Fox Valley ES44DC BNSF (Swoosh) #7632 DZ125IN

Fox Valley ES44DC BNSF (Swoosh) #7768 DZ125IN

CNW/UP
Kato AC4400CW CNW #8819 DN163K1C

Kato AC4400CW CNW #8835 DN163K1C

Atlas SD 9 GN #582 (DCC) DN163A0 (Installed)

Milwaukee Road
Atlas GP 38-2 Milwaukee Road #358

Atlas GP 38-2 Milwaukee Road #360 

Atlas GP 38-2 Milwaukee Road #365

Atlas SD 7 Milwaukee Road #509

Atlas SD 7 Milwaukee Road #510

Kato NW2 Milwaukee Road #668

Atlas SD 60 Oakway #9058

SOO Line
Atlas SD 60 SOO #6050

Atlas SD 60 SOO #6057

Friday, May 6, 2011

Update: Staging Yard is finished

The staging yard is completed, I hope to have pictures up by the end of the weekend. I have been able to run 40 to 50 car trains through it without any major problems with derailments. All section of tracks have drops, next order of bussiness is to start to run the main buss line.

JSL

Thursday, April 7, 2011

Staging Track and Photos of BNSF Loco's

The staging yard is taking shape. I have discovered that Atlas Code 55 is easier to work with than Code 80. I have had little problems with soldering feeders and joiners. Now I am just wainting on another order of flex, turnouts and rerailers to finish the staging yard. The coal trains are both 32 cars - the staging yard should be able to handle trains of about 3 - 4 locos and 60 - 70 cars.


JSL

Monday, March 7, 2011

More benchwork for the BNSF

Hi Everyone! The peninsula staging yard is taking shape. The 5 staging tracks will be between 22 to 26 feet long. The turnouts and cork have been ordered. Hope to have another update next week. Sorry for the poor quality pictures from my blackberry, need to use the good camera next time.







JSL

Friday, February 18, 2011

Benchwork started on BNSF

Here is the start of the benchwork of the new BNSF. The benchwork is the start of the staging yard, 1st deck, 2nd deck and the valance brackets. Thanks to CSX Dixieline (Jamie) for the bracket ideas.

JSL

Wednesday, January 19, 2011

Changing ERA

Hi everyone. The layout room is ready for benchwook. The birch plywood has been ripped. I have decided to start modeling the modern BNSF railroad instead of the BN / BNSF transition period. I am keeping all of my older BN engines and rolling stock to use on the club layout. I wish I had some pictures to show... I hope to soon.

End of the line!

Popular Posts